Piled raft foundation design of Zhongyu International Plaza

Yu Jinhua,Xiao Zhibin,Liu Zhonghua
DOI: https://doi.org/10.19701/j.jzjg.2013.15.026
2013-01-01
Abstract:Zhongyu International Plaza in Kunshan City is an ultra-limit high-rise building with the height of 204 meters,in which a frame-core wall hybrid system is applied.Part of a five-storey podium is connected to this building.According to the geological conditions,bored pile raft foundation is adopted.In order to optimize the piled raft foundation,variable rigidity design for balance settlement is carried out,including selecting proper pile lay-out,pile length,bearing stratum under pile toe and raft foundation thickness.The influence on the foundation of post grouting in the pile bottom is analyzed as well.As one of the measures to reduce the differential settlement,a post-pouring settlement belt is set up between the main building and the podium.The effect of the belt is evaluated by comparison with the settlement without seting up post-pouring belt.Through those measures above,differential settlement is reduced effectively,that leads to weaken the internal force of the raft foundation and secondary internal force of the superstructure.Thus the quantities of pile foundation and the materials consumption will be decreased.
What problem does this paper attempt to address?