The Procedure for Assembling the East Tokamak

Gao Daming,Wu Weiyue,Wu Songtao,Yu Jie,Yao Damao,Pan Yinnian,Liao Ziying,Chen Wenge,Yuan Chunyan,Wu Jiefeng,Wang Xiaoming,Pan Wanjiang
DOI: https://doi.org/10.1016/j.fusengdes.2007.02.012
2005-01-01
Plasma Science and Technology
Abstract:Due to the complicated constitution and high precision requirements of the EAST superconducting tokamak, a meticulous assembling procedure and measurement scheme must be established. The big size and mass of the EAST machine's components and complicated configuration with tight installation tolerances call for a highly careful assembling procedure. The assembling procedure consists of three main sub-procedures for the assembling of the base, of the tori of the VV, the vacuum vessel TS and the TF, and of the peripheral parts respectively. Before the assembly, a reference framework has been set up by means of an industrial measurement system with reference fiducial targets fixed on the wall of the test hall. In this paper, the assembling procedure is described in detail, the survey control system of the assembly is discussed, and progress in the assembly work is also reported.
What problem does this paper attempt to address?