Abstract:For a 600MW Coal-fired Power Unit,the condensate pump always designed to be high pressure,the resistance of condensing water system is designed too large,coupled with peaking units,sliding pressure deaerator and so on,the opening of water level control valve for deaerator is too small,so lead to more throttling losses,and the condensate pump always run away from economic region.Finally,more power energy is wasted.Based on the real-time data collected from power plants,this article analysis the feasibility of installing a frequency converter.The result can be a strong evidence of transformation in the future.