Study on the Rotation Pulling and Sliding Method for the Erection of a Giant Steel-pipe Truss Arch in a Gymnasium

Wang Xiaoan,Guo Yanlin,Wang Kun,Zhao Siyuan,Xu Yanlin
2009-01-01
Abstract:The giant arch cable-stayed roof structure,as a new kind of structure form,is applied widely in gymnasiums.The erection and construction of the giant steel-pipe truss arch is focused in this paper.A rotation pulling and sliding scheme is proposed.This can reduce initial internal force in the structure that are resulted from the erection by using supporting point procedure,and the construction period is greatly shorten because of the arch and the roof erected simultaneously.In order to check and show deformation amplitudes and internal forces of the arch during the whole construction,the whole construction simulation based on an integrated model is carried out.The results obtained can be further references to make construction scheme carefully and to put it into practical application.