Research on Sliding Cable in Construction of Suspend-Dome Structures

ZHANG Guo-fa,DONG Shi-lin,ZHUO Xin,GUO Jia-min,ZHAO Xiao
DOI: https://doi.org/10.3785/j.issn.1008-973x.2008.06.030
2008-01-01
Abstract:This modified original length method aims to solve the problem of simulating cable sliding at joint with friction effect.First,allow the cable slid at the joint ignoring the structural compatibility.After sliding,the original length of every cable section could be obtained based on the equilibrium equation and the invariability of total original length of those continuous sliding cables.Then,the compatibility equation with updated original cable length was solved to get the sliding result.In the sample suspend-dome project,the static friction rate was set as 0.3,the sliding friction rate was set to be 40% of the static friction,and the hoop-cable in each round was tensed symmetrically at four spots.The hoop-cable sliding values under construction state and load state(full-span load and half-span load) were calculated,and the cable forces in different states were also presented.The results show that the modified original length method can efficiently simulate the cable sliding and the unequal distribution of the tension force resulting from the friction.In the practical design and construction,friction should be avoided or lessened by improving the joint performance and construction technology.
What problem does this paper attempt to address?