Experimental Research on Construction Process of Levy Type Cable Dome

ZHENG Junhua,DONG Shilin,ZHAN Weidong
DOI: https://doi.org/10.3321/j.issn:1000-6869.2006.01.017
2006-01-01
Abstract:Construction control is a key technique in cable dome design,but the methods described in the available literatures are always very complicated.For successful application of cable domes to engineering projects,it is necessary to simplify its construction process.Based on mechanism analysis of a 5m-diameter Levy type cable dome model,this paper presents three construction methods: the first method is to construct the dome by only pulling the outmost diagonal cable,the second one is to construct it by only pulling the outmost ridge cable and the last one is to construct it by only pulling the outmost hoop cable.The experiments of the three methods are all performed in more detail,and are compared with theoretical analysis results.The experimental results agree well with the theoretical analysis,which shows that all these construction methods are feasible.And the construction research provided in this paper may be of help to further research and application of cable domes.
What problem does this paper attempt to address?