Monitored Control and Analysis of Temperature Crack in the Construction of Mass Concrete in Changxin Bridge

Zhang Hongxiang,Wang Pixiang,Li Ming
DOI: https://doi.org/10.3969/j.issn.1000-5382.2006.02.043
2006-01-01
Journal of Northeast Forestry University
Abstract:The monitoring result of temperature in mass concrete placement was analysed by using mass concrete construction in Changxin elevated highway bridge from Dunhua to Yanji as an example. The control technique of temperature crack at early age in mass concrete placement was approached. It indicates that the adopted measures are effective and practical.
What problem does this paper attempt to address?