The model experiment and research of synchronized pouring when in the shield tunneling construction in gravel stratum

DONG Qichang,HUANG Xingchun,YU Changrong
2009-01-01
Abstract:Base on the shield tunneling construction of Beijing rail transportation 10 railway,Xidian station——Liangma river Station,carried on the indoor simulation experiment of the synchronized pouring of shield tunneling construction in the saturated gravel stratum.Pouring at the back of shield,the slurry is sole harden-ability.Though monitoring the surface displacement change when in the course of pouring,and the systematically statistic,analysis the data obtained by the experiment.Consequently compare the effect of the 9 different pouring methods.Summarizes the rule,and finally obtains the most optimal pouring method.
What problem does this paper attempt to address?