Qingcaosha No.5 Trench Project Mass Invert Multiple Methods of Temperature Control Simulation and Comparative Analysis

Fu-qing LI,Guo-xiang YANG,Qi WANG,Xiang-dong HU,Wei JIANG,Feng QIAN
DOI: https://doi.org/10.3969/j.issn.1673-0836.2009.z2.071
2009-01-01
Abstract:By numerical calculation,a comparative analyzsis on the 4 construction methods with adopting 2m,10m,15m and 20m wide post casting joint in the mass invert concrete was carried out.In the calculation of finite element,the early age shrinkage of the concrete material,concrete pouring sequence and the invert borders constrain conditions are considered,and a comparative analysis of the calculation methods by using the early age high strength area has been done.The outcome proves that the construction method of replacing post casting joint is practical.