Simulation Analysis of Concrete Cast-in-situ and Verification of Formwork for the Egg-shaped Digester Tank Tower in Wuhan Sanjintan Sewage Treatment Plant

LIU Xue-Ping,CHEN Wu-Jun,ZHANG Li-Mei,CHEN Jun
2006-01-01
Abstract:A five-phase scheme of concrete-cast-in-site with a new developed construction procedure is firstly introduced for the egg-shaped digester tank tower in wuhan sanjintan sewage treatment plant.The simulation analysis is performed with respect to each phase,include the analytical model,loading condition,structural response and the design of formwork system,etc. The present works are valuable to the similar projects in the future.
What problem does this paper attempt to address?