Abstract:This article studied the united operation of five hydropower stations and adopted the comparative method.On the same condition,the system was firstly divided into two subsystems,i.e.the Three-gorges cascade and the Qingjiang cascade,modeled and solved respectively by optimal algorithm,and individual operation results were gained.Then,united operation mathematics model of two subsystems was established and solved by decomposing-concordance algorithm,and united operation results were obtained.At last,calculated results through contrastion indicated that united operation could get more than(1.829) billion kilowatt-hours' electric power.