Construction Status of Main Magnet for CYCIAE-100
Tianjue Zhang,Yinlong Lu,Junqing Zhong,Chengjie Chu,Rongfan Chen,Wei Jing,Jun Lin,Jianjun Yang,Chuan Wang,Jiansheng Xing,Zhengui Li,Zhenghe Zhou,Mingwu Fan,Jisheng Wang
DOI: https://doi.org/10.1109/TASC.2010.2042155
IF: 1.9489
2010-01-01
IEEE Transactions on Applied Superconductivity
Abstract:A new radioactive ion beam project, Beijing Radioactive Ion-beam Facility (BRIF), has been started at CIAE since 2004 . In this project, a 100 MeV H- cyclotron, CYCIAE-100, is selected as the driving accelerator providing 75-100 MeV, 200-500 proton beam. CYCIAE-100 is consisting of the main magnet, RF system, ion source and injection system, dual beam extraction system, etc. The progress of this m...