Slurry Shield in Reverse Circulation Mode Drived through the Area Reinforced by Jet Grouting Piles

Jiang Hongjin,Zhou Song,Huang Xingchun
DOI: https://doi.org/10.3969/j.issn.1009-6582.2010.03.012
2010-01-01
Abstract:When a slurry shield drived through the area reinforced by jet grouting piles near Huangpu River with a max cover depth of 43m in Shanghai,suction jam often happened in working chamber due to the inhomogeneous mass.After a distance of very difficult and slow driving by switching from normal to reverse circulation conditions continuously,serious ground subsidence and suction jam happened.A solution of driving in reverse circulation mode continuously was adopted after analyzing the torque of the cutter disk and the stresses of the mass in working chamber,the rest section was successfully passed through and the normal circulation was re-established soon after.This avoided to open the working chamber under high pressure.