Analysis on Influence of Shield Tunneling on Ground and Bridge Pile

Zhang Heng,Chen Shougen,Deng Xifei
DOI: https://doi.org/10.3969/j.issn.1673-0836.2011.03.024
2011-01-01
Abstract:The shield driving method,as one of the main construction methods of metro tunneling,has been used widely in China.The stratum movement and ground settlement induced by such construction are main issues receiving much concern during shield tunnel design and construction.Based on the shield tunneling of Shenzhen Subway Line 5 traversing Guangshen highway flyover,a 3D Fast Lagrangian Analysis of Continua is used to simulate the shield tunnel construction and analyze the ground settlement and bridge pile deformation caused by tunnel construction.The numerical modeling results show that the maximum ground settlement is 7.32mm and the main deformation of bridge pile is in horizontal direction with a maximum horizontal deformation of 2.58mm.In X direction,the deformation of lower part of bridge pile occurs in orientation deviating from the tunnel.The deformation of upper part of bridge pile is in opposite direction,that is the inclination of bridge pile occurs,and the inclination becomes larger and larger with shield tunneling,and reaches its maximum when the tunnel excavation is finished.
What problem does this paper attempt to address?