Case Analysis on Construction of Two Times Crossing and Intermediate Connection by the Large Excavation During Long Distance Directional Drilling

WANG Geng
DOI: https://doi.org/10.3969/j.issn.1004-0935.2012.02.015
2012-01-01
Abstract:In recent years,with fast development of oil and gas pipeline construction,directional drilling has become more and more common;difficulties in the construction of large diameter and long distance directional drilling have also been paid attention.In this paper,combined with some cases,the pipe laying method with long distance crossing and intermediate connection by the large excavation during directional drilling was put forward.
What problem does this paper attempt to address?