A discussion on issues of construction-management division mode in the long-distance gas pipeline project

Liu Hongjun,Wei Zhenhong,Yang Shusen
DOI: https://doi.org/10.3787/j.issn.1000-0976.2010.03.028
2010-01-01
Abstract:With the rapid development of Chinese economy, gas pipeline service is also stepping into a period of fast expansion, whereas the traditional construction system and management modes can not meet the need for the gas pipeline projects under the present and near-future condition. Therefore, in combination with actual practices, a construction-management division mode has been performed with good results by the Chinese National Petroleum Corporation (CNPC) for the long-distance gas pipeline projects. However, for the lack of enough experience within a short time, many deficiencies have been arisen in this construction-management division mode: a. How to implement construction supervision when the pipeline under construction is being parallel to or crossing over/through the one in service; b. How to protect the pipeline during the process of pipeline construction; c. Which side should be responsible for the trial operation before the pipeline is put into formal service; d. What standard should be followed when check and acceptance are being done on the completed pipeline; e. Which side should be in charge of the quality defects after the pipeline is put into service. How to solve those above-mentioned problems will directly influence the result of this construction-management division mode in the gas pipeline project. With regards to this, based on the actual pipeline projects, the content to be completed in this separate management mode was analyzed and some active proposals were put forward hereby.
What problem does this paper attempt to address?