A Study on Control Tactics of EPBM Excavation Surface Stability and Hydraulic System of Shield
张大伟,蒋强,安春龙
DOI: https://doi.org/10.3969/j.issn.1003-1251.2009.04.009
2009-01-01
Abstract:The purpose of the paper is to research control tactics of EPBM excavation surface stability under the mode of casting using screw conveyor and design the hydraulic drive system of screw conveyor for shield's functional requirements,which is inexpensive,convenient to control and flexible for loads.By analyzing the principle of earth pressure balance TBM tunneling and the factors affecting EPBM excavation surface stability,a suitable control tactics based on actual state of arts is proposed and the main parameters of screw conveyor are determined.Then,according to the requirements of control,tunneling security and loads,the parameters computation and principle design are carried out,the control tactics is proposed,which includes two dimension weighing control and double closed-loop control;the control algorithm of PDF algorithm is raised,which is outer closed-loop,the Hydraulic Drive System of screw conveyor is designed,which is constant voltage control in the inner closed-loop in the Hydraulic drive system prior to electronic proportional control,the control tactics and the hydraulic drive system are designed and are of low costs,simple and practical.It meet the challenge of EPBM tunneling process,real-time,security and reliability requirements.Furthermore,it makes the running parameters in the optimized range so that the abrasion is reduced,longevity is increased and the fault rate is lessened.