Total Thrust Calculation and Test Research for Soil Pressure Balancing Shield Tunneling

Jianhang Su,Guofang Gong,Huayong Yang
DOI: https://doi.org/10.3969/j.issn.1000-1212.2008.01.006
2008-01-01
Abstract:Soil pressure balancing shields play a more and more important role in domestic subway construction. Due to its complexity of operation environment and operation objectives, many technical parameters during operation should be carefully studied. Among them, total thrust during tunneling is one of important parameters required to be further researched. Mathematical model of total thrust of a soil pressure balancing shield functions importantly in directing the design, model selection and control method selection for a shield. A mathematical model of total thrust during tunneling is set up and influences of parameters such as opening ratio of cutter disc, contacting length between the shield and soil, friction coefficient between shield shell and surrounding soil as well as soil tank pressure to total thrust of the shield are analyzed. The mathematical model is tested and verified in the boring on a shield simulation test bench composed of a φ1800 mm shield and simulating soil tank of 8.6m long. The results demonstrate that the practical total thrust coincides basically with the mathematical model. The total thrust presents close relationship with soil tank pressure and the contacting length between shield and soil, and especially, whether the soil tank pressure is balanced represents a significant influence to the total thrust.
What problem does this paper attempt to address?