Field Measurement and Analysis of Long Span High-level Steel Truss Transfer Story Structure

Ye Xiaogang,Qin Conglü,Xiao Jianbao,Qiu Tao,Lou WenJuan,Chen Yong
2007-01-01
Abstract:High-level long span steel truss transfer story structure was adopted in the hall of Zhejiang electric power attempter building.To avoid the influence of constructing loads and temperature to the surrounding structure of the steel truss,the constructing process was divided into two stages.In the first stage,the concrete to the end of the transfer steel truss was not cast yet and the support of the truss can be referred to a moveable hinged support.After the upper stories were finished,the end of the steel truss was fixed.The stress and displacement of the first constructing stage are analyzed and compared with the model experimental results.It is shown that the test results of the deflection and the stress are close to the model experiment values.The temperature and the constructing loads from the upper stories may cause the horizontal displacement at the end of the steel truss,and the horizontal displacement is far less than the computed result of the moveable hinged support model.
What problem does this paper attempt to address?