Risk Analysis on Flood Control Level Adjustment by Flood Control Forecast and Dispatching Mode

Zhang Gaihong,Zhou Huicheng
DOI: https://doi.org/10.3969/j.issn.0559-9342.2010.01.008
2010-01-01
Abstract:A risk rate calculation method of flood control is proposed after introducing the influence of flood forecast error.By determining the risk error margin and their probabilities of over-designed and designed flood control risk,and then comparing the probabilities of flooding and the relating probability of over-designed flood risk,the over-designed risk rate of flood control level adjustment by flood control forecast and dispatching mode can be determined.As a example,the overdesigned risk rate of Baiguishan Reservoir flood is 0,0,0.0014% and 0 for designed 5%,2%,1% and 0.05% flood respectively.The result is between the maximum and the expected over-designed risk rate,and shows that the method is feasible and reasonable.
What problem does this paper attempt to address?