Extreme Risk Analysis under Uncertainty of Design Flood

黄振平,张娇娇,葛慧,程亮,王银堂
2011-01-01
Abstract:Taking Yuecheng reservoir in Zhanghe Basin as a study object,basing on the observed flood hydrograph data(more than 30 series),the extreme risk affected by uncertainty of design flood was analysis from two aspects of amplification methods and typical flood hydrograph.The highest flood-regulating level of reservoir and extreme risk of exceeding the check flood level are obtained by flood regulating for different limited water level.Through the comprehensive analysis and discussion,the limited water level of YueCheng reservoir could be heightened to 132.50 m(raise 0.50 m) in the stable cases,and could be heightened to 134.00 m(raise 2.00 m) in adventure.
What problem does this paper attempt to address?