A neural network based heuristic for resource-constrained project scheduling

Yongyi Shou
DOI: https://doi.org/10.1007/11427391_127
2005-01-01
Abstract:Resource-constrained project scheduling allocates scarce resources over time to perform a set of activities. Priority rule-based heuristics are the most widely used scheduling methods though their performance depends on the characteristics of the projects. To overcome this deficiency, a feed-forward neural network is designed and integrated into the scheduling scheme so as to automatically select the suitable priority rules for each stage of project scheduling. Testing on Patterson's classic test problems and comparison with other heuristics show that the proposed neural network based heuristic is able to improve the performance of project scheduling.