Central Air-conditioning System Design for Mingzhu Hotel of Shanghai

Chen Gang
Abstract:The conditioning system is divided into three different systems according to its function.The first one is the high and big room such as restaurant,and the second one is the meeting room,and the third is the other little rooms such as office,bedroom,KTV room and so on.The first system adopts the complete air system.The air-conditioning equipment deals with the supply and the air return.The second system uses the PAU+ AHU system,AHU system deals with the returning air,and PAU system deals with the fresh air.The third system adopts the PAU+FCU system,FCU system deals with the returning air.Natural ventilation is used in the hall and the rooms which can prevate air out.And almost all rooms' returning air is through the floor.The design adopts the same system to exhaust air and smoke,and the dualwind velocity fans are chosen.Ordinarily,it only exhaust air,it does not exhaust smoke unless the fire disaster happened.