CMS RPC Activities During LHC LS-2

Mehar Ali Shah
DOI: https://doi.org/10.1088/1748-0221/15/10/C10025
2020-05-26
Abstract:The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
Instrumentation and Detectors,High Energy Physics - Experiment