Study on incremental launching construction technology for long span concrete-filled steel tubular arch bridge

Hong Xiao-gan
Abstract:In this dissertation,the construction process of concrete-filled steel tubular arch bridge at Shihuan road of Shijiazhuang city is taken as the engineering background,a simulative computation is realized for the incremental launching construction process of the concrete-filled steel tubular arch bridge through the finite element analysis software ANSYS.The structure of the risk of the condition and the main beam of the scope of a negative cross-section are obtained,which could provide the scientific basis of the construction of the bridge.
Engineering
What problem does this paper attempt to address?