Enhanced Stochastic Approaches of 1 : 4 PCCV in Nuclear Power Plant: Uncertainty Quantification and Fragility Assessment

Bu-Seog Ju,Ho-Young Son
DOI: https://doi.org/10.1155/2024/7770831
IF: 4.6
2024-09-27
International Journal of Energy Research
Abstract:Probabilistic evaluation of the internal pressure capacity before excessive leakage is essential for ensuring preemptive response in case of a severe accident in a prestressed concrete containment vessel (PCCV) subjected to internal pressure in a nuclear power plant. Therefore, in this study, we conducted a fragility analysis to evaluate the probabilistic internal pressure capacity for damage states before excessive leakage. Three damage states were classified, and a finite element (FE) model was developed based on the experimental test results of a 1 : 4 scale PCCV under the overpressurization condition at Sandia National Laboratory. The three damage states were determined as the onset of inelastic behavior (DS1), onset of leakage (DS2), and excessive leakage (DS3). Fragility analysis was performed using a validated FE model to consider uncertainties in material properties and prestressing force. The Latin hypercube sampling method was used to perform uncertainty quantification, and normality tests verified that the samples exhibited normal distributions. The internal pressure capacity variability in DS1 and DS2 was higher than that in DS3. DS1 is the point at which the compressive deformation caused by the prestressing force was converted into tensile deformation because of the increase in the internal pressure, which resulted in tensile concrete cracking. Furthermore, DS2 is the state in which localized damage of the liner occurred and cracks in the concrete spread. Thus, the internal pressure capacity for DS1 and DS2 exhibited high variability because of the uncertainty of the prestressing force and material properties. Moreover, the median capabilities of DS1, DS2, and DS3 were ~1.85, 2.61, and 3.45 times the design pressure, respectively. Therefore, material and structural uncertainties in nuclear power plants should be appropriately considered, and a conservative assessment of the damage state before excessive leakage should be performed for preemptive response in the case of severe accidents.
energy & fuels,nuclear science & technology
What problem does this paper attempt to address?