Study on the effect of tunneling and secondary grouting on the deformation of existing pipelines in bedrock raised strata

Yongjie Qi,Xunjian Hu,Sijian Zhou,Jian Zhou,Gang Wei,Di Zhang
DOI: https://doi.org/10.1016/j.trgeo.2024.101218
IF: 4.938
2024-02-01
Transportation Geotechnics
Abstract:Shield crossing the bedrock raised strata easily leads to large deformation of the soil, resulting in deformation and damage of the upper pipelines. To investigate the law of pipeline deformation caused by shield underpassing in bedrock raised strata, the changes in the action range of the additional thrust of the cutter head (p 1), the friction resistance of the shield shell (p 2), and the additional grouting force (p 3) were analysed. A convergence model of the excavation face suitable for bedrock raised strata was proposed. The calculation formula of soil displacement at the axis of the pipeline was derived by using Mindlin’s solution and stochastic medium theory. The solutions of the vertical displacement, bending moment and strain of the pipeline were obtained by the energy variational method and the principle of minimum potential energy. Pipeline deformation analysis and reliability verification were carried out by an engineering case in Hangzhou, China. The influence of bedrock distribution and secondary grouting behind the pipe wall on pipeline deformation was studied. The results show that the calculated results are similar to the measured data with a high degree of coincidence, and the degree of agreement is higher compared to the existing method. When the shield tunneling direction is well controlled, the settlement and bending moment of the pipeline caused by the shield crossing the raised bedrock stratum will be reduced, and the reduction increases with increasing bedrock length and intrusion depth. The secondary grouting behind the pipe wall can reduce the settlement of the pipe line, but it is necessary to reasonably control the three parameters of grouting amount per unit length (V inj), grouting ring length (L h), and grouting ring angle (δ). L h should not be too long and can be controlled below 30 m, δ should be controlled within 60°, and V inj can be adjusted according to the deformation size of the pipeline to prevent excessive or insufficient correction.
engineering, civil, geological
What problem does this paper attempt to address?