Field evaluation of performance of corroded corrugated steel pipe before and after sliplining rehabilitation

Seyed Mustapha Rahmaninezhad,Jie Han,Al-Naddaf,Saif Jawad,Robert L. Parsons,Hao Lio,Mahdi Al-Naddaf,Hao Liu
DOI: https://doi.org/10.1016/j.tust.2020.103442
IF: 6.9
2020-08-01
Tunnelling and Underground Space Technology
Abstract:<p>Corrugated steel pipes installed under roadways several decades ago are reaching the end of their service lives. Excavation and replacement of these buried structures cause disruption to the transportation network and require significant funding. Trenchless rehabilitation methods have been increasingly used to reduce the overall cost of a project and disruption to the transportation network as compared with excavation and replacement. Sliplining, as one of the trenchless methods, has been used to rehabilitate buried corroded corrugated steel pipes. In this method, a new pipe of smaller diameter (i.e., liner) is placed inside an existing corroded steel pipe and the space between them is grouted. In this field study, the effect of sliplining rehabilitation on the performance of a highly corroded corrugated steel pipe, which was placed at a depth of 0.4 m under an asphalt pavement, was investigated. The steel pipe and the high-density polyethylene liner had nominal diameters of 610 and 560 mm, respectively. A low-viscosity grout was used to fill the space between the steel pipe and the liner. A series of truck loading and plate loading tests were conducted before and after the steel pipe was rehabilitated with a liner and grouting to determine: (1) load-carrying behavior and stiffness; (2) vertical and horizontal diameter changes; (3) average strain and curvature of pipes; and (4) displacement of the pavement surface. Moreover, deformations, strains, and curvatures around the circumference of the liner were monitored during sliplining and at 7 and 28 days after grouting. The sliplined corroded steel pipe behaved considerably stiffer than that before sliplining rehabilitation. The monitored deflection of the liner indicates that the liner was under compression at 7 days after grouting. At 28 days after grouting, the sliplining rehabilitation reduced the vertical diameter changes of the corroded steel pipe by approximately 81.5% under truck loading. In the field plate loading tests, the sliplining rehabilitation reduced the displacement of the pavement by 6% and 31%, and the vertical diameter changes of the corroded steel pipes by 87% and 90%, respectively, at 7 and 28 days after rehabilitation as compared with those before rehabilitation. The sliplining rehabilitation increased the load-carrying capacity of the corroded steel pipe by approximately 300%.</p>
construction & building technology,engineering, civil
What problem does this paper attempt to address?