The displacement computation and construction pre-control of a foundation pit in Shanghai utilizing FEM and intelligent methods

You-Liang Chen,Rafig Azzam,Fu-Bo Zhang
DOI: https://doi.org/10.1007/s10706-006-6807-6
2006-12-01
Geotechnical and Geological Engineering
Abstract:Controlling the displacements of foundation pit walls and supporting structures is one of the most effective measures for ensuring safety of foundation pit construction. Because of this, the accurate displacement computation of foundation pit walls and supporting structures is paid great attention by geotechnical scientists and engineers. In this paper, the three-dimensional displacement field of Deping Station foundation pit, which is part of Shanghai Track Traffic Line 6 project, is computed by means of ANSYS software. Artificial neural networks (ANNs) are a broad category of computer algorithms which have the ability to learn some target values (desired output) from a set of chosen input data that has been introduced to the network. The ANNs have very excellent ability in simulating nonlinear and complicated problems. In the current paper, the authors try to combine FEM method with ANNs so as to improve the computational accuracy. Basing on the computed results, fuzzy control theory is applied to construction pre-control. The application effect is satisfactory. The research result of current paper is very helpful for geotechnical construction and the development of geotechnical theory.
What problem does this paper attempt to address?