Soft touch temporary works: Westminster Hall roof lantern freestanding access, UK

Rachel Joshua,David Milward
DOI: https://doi.org/10.1680/jcien.22.00120
2022-12-21
Civil Engineering (Proceedings of the Institution of Civil Engineers)
Abstract:The temporary access scaffold for refurbishing Westminster Hall roof lantern at the Palace of Westminster in London, UK required a particularly sensitive approach. The only means of support other than scaffold towers 38 m apart at ground level were two awkward-shaped parapet walls. Removing the capping stones of these walls would be a health and safety risk and unsympathetic to the historic listed building. Standing over 45 m high with a main bridged span of 25 m, the scaffold was stabilised without the need for a single intrusive fixing. It was supported directly off existing parapet walls in such a way that no trace of the scaffold was left after 3 years in use.
What problem does this paper attempt to address?