Research and Application of the Type about Rapid Prototyping Mold Bag Retaining Wall Applied to Filling Stope Drift Ends

Jin Zhou Tian,Bing Shuang Yan
DOI: https://doi.org/10.4028/www.scientific.net/amm.675-677.1411
2014-10-01
Applied Mechanics and Materials
Abstract:Coal mining and filling connection is very fast in continuous mining and filling working face. How to build airtight walls at ends of filling stope drift efficiently is one of the bottleneck problems, which restricts production improving in continuous mining working face. This paper presented a design idea of the rapid prototyping mold bag wall, analyzed its structure, did much research and finally provided the design. Field application showed that it improved construction efficiency and reduced cost.