High Large-scale Mining Stope Retaining Wall of All Tailings Filling Reliability of the Mechanical Analysis

Xue Yi-zhong
Abstract:Dongguashan copper deposit buried in the surface depth of 1000 meters,complex tectonic stress of mine region,belong to the height stress distribution region,a big empty field later cemented all tailings fill mining.Ac- cording to filling slurry of three different mechanicses state of property for the filling retaining wall on the analysis of force and calculation ,pointed out affect the factor to the reliability of retaining wall and offered the first region of 8' mining stope retaining wall implementation of the plan.
Engineering
What problem does this paper attempt to address?