Bore pile foundation tall buildings closed in the heritage building

Nusa Setiani Triastuti
DOI: https://doi.org/10.1063/1.5011606
2017-01-01
AIP Conference Proceedings
Abstract:Bore pile foundation for high building surroundings heritage building should be not damage. Construction proses must good, no necking, no mixed deep water, no sliding soil, nonporous concrete. Objective the execution of bore pile so that heritage buildings and neighboring buildings that are old do not experience cracks, damage and tilting. The survey methodology was observe the process of the implementation of the dominant silt, clay soil, in addition a limited space and to analyze the results of loading tests, investigations of soil and daily reports. Construction process determines the success of the structure bore pile in high building structure bearing, without damaging a heritage building. Attainment the hard soil depth, density concrete, observable clean reinforcement in the implementation. Monitoring the implementation of, among others, the face of the ground water little reduce in the area and outside the footprint of the building, no impact of vibration drilling equipment, watching the mud content on the water coming out at the time of drilling, concrete volume was monitored each 2 m bore depth of pile, The result researched heritage building was not damage. The test results bore pile axial, lateral analyzed the results have the appropriate force design required.
What problem does this paper attempt to address?