Vertical Bearing Capacity of Large-Diameter Bored Pile

Nian-wu LIU,Xiao-nan GONG,Feng YU
DOI: https://doi.org/10.3785/j.issn.1008-973x.2015.04.022
2015-01-01
Abstract:T he self‐balancing test w as conducted on tw o 2 .2 m diameter drilled piles in order to analyze the bearing capacity of large diameter bored piles .The test results were compared with in‐situ test results . Results show that the change of load‐displacement of pile with post‐grouting is slower than pile without post‐grouting .The end resistance reached the limit state when pile tip displacements approached 20 mm (1% D ,D is the pile diameter) .The side resistance increased firstly and maintained a stable trend with the increase of pile‐soil relative displacement .The critical displacement was 1 .5‐3 .0 mm .Post‐grouting can improve the side resistance over a certain depth from the pile tip ,and the improvement in round gravel mixed pebble bed is 18 percent . Resistive loads up and dow n the side of the load cell is different and transformation coefficient is 0 .92 and 0 .91 , respectively . Side resistance and undrained vane‐shear strength has a linear relationship and has a better goodness of fit .The ultimate side resistance of round gravel mixed can be estimated by dynamic sounding (63 .5 kg) hits .
What problem does this paper attempt to address?