Analysis of holding time variations to Ni and Fe content and morphology in nickel laterite limonitic reduction process by using coal-dolomite bed

Fakhreza Abdul,Sungging Pintowantoro,Ridwan Bagus Yuwandono
DOI: https://doi.org/10.1063/1.5030255
2018-01-01
AIP Conference Proceedings
Abstract:With the depletion of nickel sulfide ore resources, the nickel laterit processing become an attention to fulfill nickel world demans. Reducing laterite nickel by using a low cost carbonaceous reductan has proved produces high grade ferronickel alloy. In this research, reduction was carried out to low grade laterite nickel (limonite) with 1.25% nikel content by using CO gas reductant formed by reaction between coal and dolomite. Reduction process preceded by forming brickets mixture from limonit ore, coal, and Na2SO4, then the brickets placed inside crucible bed together with dolomit and reduced at temperature 1400 °C with holding time variations 4, 6, and 8 hours. EDX, XRD, and SEM test were carried out to find out the Ni and nickel grade after reduced, the phases that formed, and the morphology brickets after reduced. The reduction results shows that the highest increase on nickel grade was obtained by 8 hours holding time increasing 5.84 % from initial grade, and the highest recovery was obtained by 6 hours holding time with recovery 88.51 %. While the higest increase on Fe grade was obtained by 4 hours holding time, and the highest recovery Fe was obtained by 4 hours holding time with recovery 85.41%.
What problem does this paper attempt to address?