A NEW MODEL FOR PREDICTING THE ADVANCE RATE OF A TUNNEL BORING MACHINE (TBM) IN HARD ROCK CONDITIONS

Mohammad Hossein Arbabsiar,Mohammad Ali Ebrahimi Farsangi,Hamid Mansouri
DOI: https://doi.org/10.17794/rgn.2020.2.6
2020-01-01
Abstract:The prediction of the advance rate of a Tunnel Boring Machine (TBM) in hard rock conditions is one of the most important concerns for estimating the time and costs of a tunnel project. In this paper, in the first step, a model based on...
What problem does this paper attempt to address?