An empirical method for estimating TBM penetration rate using tunnelling specific energy
Lei She,Cheng-cheng Hu,Yan-long Li,She-rong Zhang,Chao Wang,Yu-jie Wang,Ming-ming He,Shi-min Li,Sheng-le Wang
DOI: https://doi.org/10.1016/j.tust.2023.105525
IF: 6.9
2023-12-13
Tunnelling and Underground Space Technology
Abstract:Establishing a suitable tunnel boring machine (TBM) performance estimation model is benefit to the machine type selection, project scheduling and budgeting. Although various models have been developed to predict TBM performance, most of these models use a relatively small specific database, which is difficult to be applied to engineering practice. In this study, some equations for estimating TBM penetration rate ( PR ) applicable to different geological conditions are proposed. Firstly, a TBM construction performance database containing 159 tunnel sections is built according to four different tunnel projects originating from China, which covers rock mass properties, TBM specification parameters and performance information. By eliminating the effects of some TBM specification and operating parameters, a normalized energy index is proposed for assessing the rock mass boreability. On this basis, a series of statistical analysis, i.e. linear multiple regression (LMR) and non-linear multiple regression (NLMR) are used to develop some empirical equations for estimating the PR by employing rock mass properties and TBM specification parameters, and more than 84% of the PR can be accurately predicted. Finally, to further evaluate the prediction performance of these equations, they are compared and discussed with fifteen published typical models, and the results proved that the models developed in this study are more reasonable and reliable. It should be noted that the input parameters of these equations are readily available at the project planning stage, thus they are very simple and practical for designers and constructors.
construction & building technology,engineering, civil