Numerical simulation of shield underneath passing a river in shallow water-rich sand layer

Qiang He,Gong Jian,Wengxiang Ning
DOI: https://doi.org/10.1088/1755-1315/634/1/012017
2021-02-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract In view of the situation that the tunnel of Hangzhou Metro Line 6 underneath passed the Yongjiu River, the influences of the construction of the new double-line tunnel on the seepage field and stress field of the shallow buried water-rich sand layer were analyzed, and the ground reinforcement measures to ensure the safety of shield construction was proposed. The results show that: (1) After the tunnel is excavated, the seepage field gradually returns to the original seepage field, but there is still a slight disturbance in the seepage field within 30 m below the arch bottom; (2) The maximum displacement and maximum principal stress of the tunnel model are located at the bottom of the arch; (3) It is necessary to fully consider the conditions of the river, control the settlement and cracking of the foundation, and prevent the occurrence of gushing.
What problem does this paper attempt to address?