Analysis of Coupled Seepage and Stress of Shield Tunnel Launching Accident in Soft Clay

Wei Gang,Guo Zhi-wei,Wei Xin-jiang,Chen Wei-jun
DOI: https://doi.org/10.3969/j.issn.1000-7598.2010.z1.060
2010-01-01
Abstract:The disaster causes of gushing water and sand during shield departure from shaft are analyzed; and the finite element model of shield departure construction is established using Midas-GTS software. Considering coupled seepage and stress of shield departure construction, the groundwater permeates from reinforced soil around underlying layer to wall is analyzed; and the settlement of the undisturbed soil in front of the reinforced soil is studied. An example is given to demonstrate that: supposing the reinforced soil is impervious, the accident that water and sand inflows from tunnel portal is influenced by length of soil reinforcement and groundwater level; increasing the length of reinforced soil is good for engineering safety; but the cost is high. Decreasing the groundwater level could reduce the disaster of gushing water and sand during shield departure from shaft. Reasonable construction parameters for a project are determined by taking into account of economy, security and time limit.
What problem does this paper attempt to address?