Investigation of Crevice Corrosion Behavior of HRB355 Steel in 3.5% NaCl solution using Coupled multi-electrode arrays

Yangyang Guo,
DOI: https://doi.org/10.20964/2021.08.47
IF: 1.541
2021-08-01
International Journal of Electrochemical Science
Abstract:During its lifetime, the cracks formed in concrete can accelerate the corrosion process of steel rebars, resulting in the decrease in the steel area and corresponding strength of steel bars which might lead to even a catastrophic fracture. There have been a few studies carried out on the formation mechanism of corrosion cracks in concrete structures and the corrosion behavior of metals under alternate drying-wetting conditions. In this paper, the formation of crevice corrosion in concrete structures and the corrosion behavior of metal under alternate drying-wetting conditions have been analyzed by using array electrode and wedge-crevice structure. The results showed that the crevice corrosion in concrete can take place in two stages. During 0-36 h, the crevice area and the exposed area were divided into apparent cathode area and anode area, during which the diffusion process of corrosive medium at the interface and the formation process of oxygen concentration difference battery primarily took place. Within 36-72 h, the corrosion cracks were formed, and the experimental system was corroded by the difference of oxygen concentrations in the battery. With the increase in drying-wetting time, the corrosion driving force and the corrosion current density of the metal increased as well as the total corrosion rate and the max pit depth increased, whereas the pitting rate decreased. As the distance from the crack increased, the total corrosion rate decreased and the corresponding pitting rate increased, while the corrosion morphology changed from total corrosion to pitting corrosion.
What problem does this paper attempt to address?