Field Test of 3 phase, 22.9kV, 100m HTS Cable System in KEPCO

S H Sohn,H S Choi,H R Kim,O B Hyun,S W Yim,T Masuda,K Yatsuka,M Watanabe,H S Ryoo,H S Yang,D L Kim,S D Hwang
DOI: https://doi.org/10.1088/1742-6596/43/1/216
2006-06-01
Journal of Physics: Conference Series
Abstract:Starting from investigation of feasibility and basic studies, KEPCO/KEPRI has carried an enterprising project for HTS cable system since 2002. The objectives of this project are to demonstrate HTS cable system and evaluate the feasibility in electricity utility's view. The installation of 100m/3phase/22.9kV/50MVA HTS cable system is undergoing in KEPCO's test yard, located in Gochang, Korea. The HTS cable system consists of 100m long cable, two terminations and a cooling system. To simulate the actual cable installation, the 55m section of the 100m long cable was installed into an underground tunnel. Commissioning test is scheduled at the end of September, 2005 and followed by long term operation test. In this paper, the installation of HTS cable system and initial results of system operation will be summarized
What problem does this paper attempt to address?