Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty

X. ZHAO,J. C. GOODALE,T. S. LEE
DOI: https://doi.org/10.1080/00207549508904814
IF: 9.018
1995-08-01
International Journal of Production Research
Abstract:Freezing the master production schedule (MPS) is one of the frequently used methods for reducing schedule instability in multilevel material requirements planning (MRP) systems. The selection of the lot-sizing rule is an important decision in MRP systems and has been shown to significantly influence MRP performance. This study examines the interaction between the selection of lot-sizing rules and the selection of MPS freezing parameters under rolling time horizons under different demand uncertainty conditions. The findings of this study enhance the understanding of multilevel MRP performance in a more realistic environment and help MRP practitioners select the proper lot-sizing rule and MPS freezing parameters.
engineering, manufacturing, industrial,operations research & management science
What problem does this paper attempt to address?