Lot sizing and furnace scheduling in small foundries

Silvio A. de Araujo,Marcos N. Arenales,Alistair R. Clark
DOI: https://doi.org/10.1016/j.cor.2006.05.010
2008-03-01
Abstract:A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry's own practice.
computer science, interdisciplinary applications,engineering, industrial,operations research & management science
What problem does this paper attempt to address?