A bi-level optimization method for integrated production scheduling between continuous casting and hot rolling processes

Sheng-long Jiang,Yaomin Wen,Lingling Cao,Wei Tang
DOI: https://doi.org/10.1109/CASE49997.2022.9926732
2022-08-20
Abstract:To improve production efficiency and reduce energy costs in steel manufacturing, this paper investigates the integrated production scheduling problem between continuous casting and hot rolling (IPSP-CCHR) and formulates it as a bi-level optimization model. The upper-level one is the production planning match problem (PPMP) between continuous casting and hot rolling processes, which aims to maximize productivity. The lower-level one is the reheating furnace scheduling problem (RFSP), which aims to minimize the total residence time. Next, we propose a stratified sampling bi-level optimization (SSBLO) algorithm to solve the IPSP-CCHR, which applies Latin Hypercube sampling (LHS) for solving the upper-level problem and estimation of distribution algorithm (EDA) for solving the lower-level problem. In the experiments, computational results via well-synthetic data show the bi-level optimization model and the proposed algorithm is effective and is expected to apply in realistic industrial cases.
Computer Science,Materials Science,Engineering
What problem does this paper attempt to address?