Production Lot-Sizing Decision Making Considering Bottleneck Drift in Multi-Stage Manufacturing System

F. L. Zhou,X. Wang,Y. D. He,M. Goh
DOI: https://doi.org/10.14743/apem2017.3.252
2017-01-01
Advances in Production Engineering & Management
Abstract:Under a capacity constrained multi-product manufacturing system, the products are usually prepared and produced in lots. As a lot-sizing strategy is critical for effective production and high productivity, this encourages practical and research interest in the strategic batch sizing decision for a minimum procedure time in an order-to-delivery (OTD) operating environment. While the lot-sizing plan can be formed by studying the manufacturing parameters of the established bottleneck procedure, for a multi-stage manufacturing system, the bottleneck is not fixed and fluctuates with the production rate or batch size. This paper proposes a lot-sizing strategy to determine the optimal lot-size for each class of products taking bottleneck drifting into consideration. A queuing network analyser (QNA) method is employed to deal with the non-linear mixed integer programming model targeting at the total flow time minimization of the system. A practical case is presented and solved using the proposed method, and the results are validated with Flexsim, a simulation model. (C) 2017 PEI, University of Maribor. All rights reserved.
What problem does this paper attempt to address?