Multi-product Multi-route Production Planning Simultaneously Considering Partial Backlogs and Lost Sales

Shan Lu,Hongye Su,Yue Wang,Lei Xie,Li Zhu
2014-01-01
Abstract:production stage and inventory is depicted separately, for which fluctuations can be alleviated by utilizing the spare capacity or even overtime in advance. Order demand can be fulfilled from end item inventory, however, if insufficient, both backlogs and lost sales are allowed. Trade-off between these two scenarios is interposed by a policy that lost sales occur when orders are backlogged over a time-phased threshold. The proposed planning problem is exactly formulated by a mixed-integer nonlinear programming (MINLP) model that minimizes the corresponding cost, and then reformulated by a mixed-integer linear programming model (MILP) using linearization techniques. Consequently, a case study oriented from a steel rolling mill plant is introduced to illustrate the effectiveness of the proposed approaches.
What problem does this paper attempt to address?