Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria

Roger Atkinson
DOI: https://doi.org/10.1016/s0263-7863(98)00069-6
IF: 9.037
1999-12-01
International Journal of Project Management
Abstract:This paper provides some thoughts about success criteria for IS–IT project management. Cost, time and quality (The Iron Triangle), over the last 50 years have become inextricably linked with measuring the success of project management. This is perhaps not surprising, since over the same period those criteria are usually included in the description of project management. Time and costs are at best, only guesses, calculated at a time when least is known about the project. Quality is a phenomenon, it is an emergent property of peoples different attitudes and beliefs, which often change over the development life-cycle of a project. Why has project management been so reluctant to adopt other criteria in addition to the Iron Triangle, such as stakeholder benefits against which projects can be assessed? This paper proposes a new framework to consider success criteria, The Square Route.
management
What problem does this paper attempt to address?