Abstract:The problems of finding a schedule with minimal maximum lateness, respectively with minimal mean flow time for 2-machine flow shops with no wait in process, and related problems, including versions with unit processing times and a single resource constraint, are shown to be NP-hard in the strong sense. An algorithm is presented which finds a minimum makespan schedule with no wait in process for the 2-machine unit processing time flow shop under a single resource constraint inO (n logn) time. The obtained results continue to hold for the corresponding preemptive respectively nonpreemptive cases.