Improved approximation algorithms for routing shop scheduling

Wei Yu,Guochuan Zhang
DOI: https://doi.org/10.1007/978-3-642-25591-5_5
2011-01-01
Abstract:We investigate a generalization of classical shop scheduling where n jobs are located at the vertices of a general undirected graph and m machines must travel between the vertices to process the jobs. The aim is to minimize the makespan. For the open shop problem, we develop an O(logmloglogm)-approximation algorithm that significantly improves upon the best known $O(\sqrt{m})$-approximation algorithm. For the flow shop problem, we present an O(m2/3)-approximation algorithm that improves upon the best known $\max\{\frac{m+1}{2},\rho\}$-approximation algorithm, where ρ is the approximation factor for metric TSP.
What problem does this paper attempt to address?