Optimal Scheduling under Probabilistic Time and Cost

Zhiyong Wu
IF: 2.034
2002-01-01
Systems Engineering
Abstract:In this paper, the risk of schedule in a project under randomness of both time and cost is analyzed. A model called DSPSP is proposed to determine optimal delay time for each activity so as to maximize the project's expected net present value in terms of financial cost and the risk of delaying the cash inflow. Duration and cost of each activity are dependent discrete random variables. The optimization result of two instances using a simulated annealing procedure is much better than the two extreme strategies: the very conservative one and the very optimistic one.